Here is the list of the main work to be done at 54 month or 90,000 kms.
+ replace engine air cleaner filter
+ replace automatic transmission fluid
+ replace air-conditioner filter
+ replace engine oil filter
+ replace fuel filter
+ replace rear differential oil
+ replace brake fluid
+ rotate wheels and balance front wheels
+ fill engine oil
+ replace spark plugs
plus the rest is inspect
I have been quoted from $1000 to highest $1900.